Fire Station No. 40

City of Dallas, TX

Location Dallas, TX

Completion Date 2008

Size 11,977 SF

Dallas Fire Station No. 40 was designed as a high-performance public safety facility and achieved LEED Silver certification. The project introduces a ground-breaking “Roundhouse” Apparatus Bay concept that rethinks traditional fire station planning to improve firefighter readiness and operational efficiency.

The arc-shaped apparatus bay creates trapezoidal truck bays that provide additional staging and dressing space between apparatus cabs—precisely where firefighters need room for boots, turnout gear, and equipment during rapid response. The radial façade increases visibility into the apparatus bay, allowing the public to see the station’s firefighting apparatus and reinforcing the connection between the fire service and the community it serves.

The station includes six apparatus bays and complete living and operational support spaces, including sleeping quarters for firefighters, lieutenant and battalion chief offices with associated quarters, locker rooms and showers, a commercial kitchen, fitness center, day room, video training area, watch/dispatch room, EMS storage, emergency operations space, decontamination and extraction rooms, SCBA facilities, and general storage. 

Project Details

Client
City of Dallas, TX
Project Type
Fire
Completion Date
2008
Services
Programming / Planning
Architectural / Interior Design
Size
11,977 SF
Designer

Randall Scott

Region

North Texas

Our Office

4975 Preston Park Blvd.
Suite 620

Plano, Texas 75093

972.664.9100